| The cement
continues to be poured throughout the night. |
| |
 |
| |
The long black
handle inserted into the cement is
a concrete vibrator used to make sure there are
no air pockets and that the concrete is dense |
| |
 |
| |
Below you can
see the completed foundation.
The short rebar sticking up from the foundation
will become part of the wall system
so that the walls and foundation are tied together.
The columns will also be tied all the way into the foundation
and will reach up to the second level floor system. |
| |
 |
| |
 |
| |