LOT 206

OCTAGON HOUSE

FOUNDATION WORK

< BACK TO PICTURE GALLERY | 1 | 2 | 3 | 4 | 5 | BACK TO LOT 206 GALLERY >
 
The cement continues to be poured throughout the night.
 
lot_206_-_0022
 
The long black handle inserted into the cement is
a concrete vibrator used to make sure there are
no air pockets and that the concrete is dense
 
lot_206_-_0026
 
Below you can see the completed foundation.
The short rebar sticking up from the foundation
will become part of the wall system
so that the walls and foundation are tied together.
The columns will also be tied all the way into the foundation
and will reach up to the second level floor system.
 
lot_206_-_0027
 
lot_206_-_0028
 