Within the columns being formed rebar extends which
will be tied into the second level floor system,
so when the cement is poured it will all become one piece.
 
lot_252_-_0031
 
lot_252_-_0032
Here the plumbing can be seen which will become
the out door shower underneath the second level deck,
facing the beach.
 
lot_252_-_0035
Wood form work to create arch details, 
concrete will be poured into this to make the deck all one unit.
 
lot_252_-_0037
Rebar support inside of each column which
will tie into the second level floor system.
 
lot_252_-_0038
The concrete has been poured, the forms removed
and the arches await their final layer of plaster.
The details on the arches were created from the forms
made on site for this home.
 