LOT 252

FOUNDATION WORK

< BACK TO PICTURE GALLERY | 1 | 2 | 3 | BACK TO LOT 252 GALLERY >
 
lot_252_1x
This is the maze of the spread footer system
and the beams which will tie them all together.
 
The pictures below are after the footer system
and beams have been poured.
The area has been back filled and
prepared for the pouring of the ground level slab.
 
lot_252_-_0001
 
lot_252_-_0002
 
lot_252_-_0003
 
< BACK TO PICTURE GALLERY | 1 | 2 | 3 | BACK TO LOT 252 GALLERY >