LOT 252
FOUNDATION WORK
<
BACK TO PICTURE GALLERY
|
1
| 2 |
3
|
BACK TO LOT 252 GALLERY
>
The plumbing and utility lines have been run through the slab,
the steel is down and final preparations before slab is poured.
The plastic sheets are a moisture barrier
set down on foundation before slab is poured.
Here adjustments are being made to the plumbing
on what will be the out door shower
below the deck, on the beach side
<
BACK TO PICTURE GALLERY
|
1
| 2 |
3
|
BACK TO LOT 252 GALLERY
>