LOT 252

FOUNDATION WORK

< BACK TO PICTURE GALLERY | 1 | 2 | 3 | BACK TO LOT 252 GALLERY >
 
The plumbing and utility lines have been run through the slab,
the steel is down and final preparations before slab is poured.
 
lot_252_-_0005
The plastic sheets are a moisture barrier
set down on foundation before slab is poured.
 
lot_252_-_0006
Here adjustments are being made to the plumbing
on what will be the out door shower
below the deck, on the beach side
 
lot_252_-_0007
 
lot_252_-_0008
 
< BACK TO PICTURE GALLERY | 1 | 2 | 3 | BACK TO LOT 252 GALLERY >