NTB
REMODEL
Second Floor Work
(Kitchen & Copy Room) |
| < BACK
TO PICTURE GALLERY | 1 | 2 |
3 | 4 |
BACK TO NTB GALLERY
> |
| |
Due to the size and number of photographs
this page will take 1-2 minutes to load
We appreciate your patience. |
| |
October
24 - View from stairs toward kitchen.
The kitchen will be
split into two rooms.
A smaller kitchen and a copy room.
|
| |
October
30 - View from window which is
in front of the kitchen
doorway
and faces west.
This window will be blocked up.
|
| |
October
25 - Second doorway is created
next to the original kitchen
doorway.
|
| |
October
25 - Kitchen walls are stripped.
|
| |
October
25 - View from inside kitchen
looking through new doorway. |
| |
October
30 - View of both doorways. |
| |
October
30 - Framework goes up for wall
between kitchen and copy room. |
| |
October
30 - View from within kitchen of wall framework. |
| |
October
31 |
| |
October
31 |
| |
October
31 |
| |
November
5 - Walls are patched and drywall is being installed. |
| |
November
5 |
| |
November 13 - Drywall installation is complete. |
| |
November
16 - View from hallway of both doorways.
To the left you can
see that the old window has been blocked in. |
| |
November
16 - Painting of kitchen and copy room. |
| |
November
16 - Painting. |
| |