Second Floor Work
(Bathroom) |
| < BACK
TO PICTURE GALLERY | 1 |
2 | 3 | 4 |
BACK TO NTB GALLERY
> |
| |
Due to the size and number of photographs
this page will take 1-2 minutes to load
We appreciate your patience. |
| |
October
24 - Bathroom.
|
| |
October
25 - Bathroom stripped down to the walls.
|
| |
October
25
|
| |
October
25
|
| |
October
31 - Bathroom window blocked in
half way to make a smaller
window. |
| |
November
2 - Wiring work. |
| |