NTB REMODEL

Second Floor Work
(Bathroom)

< BACK TO PICTURE GALLERY | 1 | 2 | 3 | 4 | BACK TO NTB GALLERY >
 
Due to the size and number of photographs
this page will take 1-2 minutes to load
We appreciate your patience.
 
10-24-00_2nd_Floor_Bath

October 24 - Bathroom.

 
10-25-00_2nd_Floor_Bath

October 25 - Bathroom stripped down to the walls.

 
10-25-00_2nd_Floor_Bath

October 25

 
10-25-00_2nd_Floor_Bath

October 25

 
10-31-00_2nd_Floor_Bath

October 31 - Bathroom window blocked in 
half way to make a smaller window.

 
11-2-00_2nd_Floor_Bath

November 2 - Wiring work.

 